← All projects

Project 08 · Resilience proposal

Resilience Mesh

Resilience Mesh is a public-interest proposal asking government to fund and manage a staged feasibility programme for connected water, energy and communications risks in Western Australia. It asks what can be planned safely before a crisis—not for authority to control live infrastructure.

Why this matters

Risk before
response.

The case for Resilience Mesh begins with a failure mode rather than a product: networked irrigation controllers, cloud brokers, update paths, and uneven device security can create a shared control surface without a shared safety language. A malicious command, software defect, communications failure, or synchronised response could create consequences far beyond a single garden or device.

  • Hydraulic risk: simultaneous valve transitions could create pressure transients and physical damage. That risk must be measured in a controlled testbed, not assumed away.
  • Cyber risk: a compromised broker, update path, credential, or device could issue or relay unauthorised commands across many endpoints.
  • Civil risk: blunt restrictions could affect domestic water, sanitation, medical needs, or fire protection if non-essential irrigation is not physically separated.
  • Operational risk: communications loss, stale clocks, vendor outages, and emergencies can leave devices in unsafe or confusing states.
  • Governance risk: without authenticated roles, short-lived authority, audit, manual fallback, exemptions, and appeals, responsibility becomes difficult to locate.

Application levels

Start small.
Scale with proof.

The figures below are indicative planning envelopes from the current proposal bundle. They are not validated market quotes, grant awards, or a deployment budget.

00 / Evidence

Simulate and observe

Run an offline simulator with synthetic devices, threat cases, safety-governor rules, and monitor-only data. No commands are sent to household, utility, or emergency systems.

Indicative cost
To be scoped; lowest-cost learning path
Indicative time
Weeks to months, depending on scope
01 / Pilot

Monitor and notify

Use read-only or monitor-only paths for legacy devices to detect conditions, notify operators and residents, and test evidence, exemptions, and recovery without actuation.

Indicative cost
Lower-cost pilot; hardware and data access still need costing
Indicative time
Months, after an approved test plan
02 / Controlled

Dedicated irrigation pilot

A bounded, opt-in pilot for dedicated non-essential irrigation, with independent plumbing, cyber, legal, rights, and safety gates before any actuation is considered.

Indicative cost
$900k concept envelope: Phase 0 $250k + Phase 1 $650k; not a quote
Indicative time
Months 1–9 in the current concept bundle
03 / Regional

District demonstration

Only after the earlier gates pass: test interoperability and demand-management behaviour at broader scale while preserving local fallback, auditability, and life-safety boundaries.

Indicative cost
$1.35M concept Phase 2; $2.25M total staged bundle; not an award
Indicative time
Months 10–18 in the current concept bundle

Governance choices

Who carries
the cost?

The technical question is inseparable from the economic one: who pays for safety, who is accountable for it, and who can challenge or stop it when the stakes change?

A / Public layer

Government-supplied safety retrofit

A utility or council could fund and provide an accredited gateway or safety layer for eligible properties. This may improve coverage and equity, but taxpayers and ratepayers carry procurement, maintenance, liability, privacy, and replacement costs.

B / Supplier pathway

Make compatibility a market requirement

Procurement or regulation could require suppliers to expose signed, authenticated, capability-based safety communications in new devices and updates. That avoids replacing every controller, but legacy equipment still needs monitor-only or approved gateway paths.

C / Hybrid

Standards, gateways, and legacy safeguards

A proportionate route could combine common safety semantics, certified gateways for compatible devices, monitor-only treatment for legacy devices, and public funding only where a public-interest gap is demonstrated.

D / Avoid

Closed proprietary control plane

A single vendor system may look quick to procure, but it concentrates authority, increases lock-in, and makes replacement, audit, emergency access, and long-term cost harder to control.

Any supplier mandate, utility role, public funding model, or emergency authority would need fresh legal, procurement, privacy, community, and technical review. This page presents choices for discussion, not an instruction to control infrastructure.

The timing case

Why now
matters.

The strongest argument for starting now is not that a catastrophe is guaranteed. It is that the safe learning window is before the incident: when devices can be inventoried, simulations can be challenged, suppliers can implement interoperable semantics, and a pilot can be stopped without putting residents at risk.

  • If work waits for a failure, the response could become emergency procurement, vendor hotfixes, or a rushed universal control path.
  • A malicious event could combine device weakness, cloud authority, and physical infrastructure; an accidental event could produce many of the same effects without an attacker.
  • Early mitigation can be proportionate: start with simulation and monitoring, then make actuation contingent on independent evidence, human approval, due process, rollback, and emergency override.
  • The upside is not only avoiding damage: interoperable safety communications could help authorised parties coordinate non-essential services during drought, fire, outage, or recovery without taking control away from residents or utilities.

These are failure scenarios and planning arguments to test, not confirmed incidents or forecasts. The proposal does not establish that current networks are vulnerable or that any agency has adopted this approach.

The brief

What it
does.

  • Explains how water, energy, communications, cyber access and physical controls can interact during drought, heat, fire and outage—and why plans need to be agreed before a crisis.
  • Sets out staged options from evidence review and offline simulation to operator-led, controlled testing, with each stage subject to independent safety, legal and community review.
  • Keeps the proposal conceptual: local authority, pressure limits, hardware behaviour, emergency approval, funding and field feasibility remain for accountable agencies and experts to resolve.

Retrospective

Still
becoming.

The idea arose from concern that water services, energy, communications and connected controls can fail together, while the rules for using that interdependence safely are unsettled. The public site is for awareness and outreach; the proposed next step is government-funded, operator-managed feasibility work, followed by decisions on what to build or rule out. Resilience Mesh is not a deployed system.

Back to the project map