Why I believe governments and water operators should fund a careful feasibility study for connected water controls, grounded in current evidence and a staged path that can still say no.

By Brendon James Boyd4 November 20268 min read

I started Resilience Mesh with a question, not a product: if connected systems can influence irrigation, what rules should govern their use when water and public safety are under stress? The answer cannot come from a personal project, an app, or a simulated scenario. It needs the people responsible for water services, public safety, and infrastructure to decide what should be studied, funded, and ruled out.

01

The idea began as a question

I have been thinking about the boundary between digitally managed outdoor irrigation and public water services during heat, drought, or other periods of pressure. Some irrigation controllers can be managed through networked services. That creates a practical question: if water use needs to change during a defined event, who has authority to ask for a change, which devices could safely take part, and how would operators know what happened?

Resilience Mesh is my concept for exploring whether carefully bounded coordination of non-essential outdoor irrigation could support a wider resilience plan. The boundaries matter as much as the idea. Drinking water, sanitation, and fire protection must not become resources that a new coordination layer can interrupt. A signed instruction or an internet connection would never be enough to establish that an action is safe.

Those are design questions, not established answers. I do not have evidence that a local irrigation fleet has caused a water-service failure, and this project does not show that a shared control system would prevent one. It gives the question a name so that the right public agencies and asset owners can decide whether the problem is real, what evidence is missing, and whether any new system should exist at all.

02

What recent evidence can tell us

Australia’s Annual Cyber Threat Report for 2025–26 says the Australian Cyber Security Centre responded to 154 critical-infrastructure incidents. Electricity, gas, water, and waste services made up 17 per cent of the listed industry divisions. Those are reported cyber incidents. They are not a count of water outages or proof that physical water equipment was affected in every case.

A July 2026 alert from the United States FBI and Environmental Protection Agency is more specific. Water and wastewater utilities in at least seven states reported incidents involving internet-facing programmable controllers, and some activity degraded operations. The alert describes loss of monitoring and control, with pressure loss and flooding among the reported effects. It also says consequences depended on the device’s function and the operator’s ability to switch to manual operation.

The Canadian Centre for Cyber Security has separately warned of a global campaign targeting internet-exposed industrial controllers used for processes such as pumps, valves, pressure, and temperature. In November, news reports also described suspected cyber incidents affecting supermarket refrigeration in Europe. These are different countries, systems, and evidence levels. They do not establish one actor or show that consumer irrigation platforms have been compromised.

The useful lesson is narrower and more practical: connected controls can matter to physical operations, third-party access can be hard to see, and recovery depends on what local operators can still do. That makes mapping and testing responsibilities worthwhile. It does not tell us that the Mesh concept is the right answer.

03

The cost of waiting

No one can honestly say that a local failure is certain, or that a new network would make one less likely. Doing nothing can also mean that basic questions remain unanswered: which organisations own the relevant assets, which suppliers can reach them, what happens when communications fail, who can stop or restore activity, and which safety functions must stay independent.

If a heat event, water restriction, equipment fault, cyber incident, or communications outage arrives before those questions are settled, people may have to work them out under pressure. The result could be delayed decisions, conflicting instructions, or a recovery plan that has not been tested against the equipment and operating rules in front of them. Those are risks to examine, not predictions that a particular failure will happen.

Choosing not to build Resilience Mesh would not have to mean choosing inaction. A study could conclude that existing utility controls, better access management, clearer procedures, or improved recovery planning are enough. That would still be useful work. The avoidable outcome is leaving the decision until a crisis forces it.

04

A staged path, with a real stop point

I see several steps between a public-interest question and any possible field use. Each step should have an owner, a clear purpose, and evidence that is strong enough for the next decision. The aim is not to move quickly toward a product; building nothing must remain an acceptable outcome.

  • Start with the protections operators already control. Government and asset owners can review direct internet exposure, supplier and cellular access, manual operation, incident reporting, and known-clean recovery using existing operational guidance.
  • Fund an independent feasibility study. Map ownership, access paths, water sources, operating boundaries, legal authority, emergency roles, costs, and measurable outcomes. Compare the current approach with procedural coordination, information sharing, offline decision support, and any later control option.
  • Use offline exercises to test the questions and decision rules. Synthetic data can show whether a proposal handles permissions, conflicting instructions, or loss of communications. It cannot predict real pressure, equipment behaviour, or the effect on a water network.
  • Only if the study supports it, ask the asset owner to approve bench work on an exact device and firmware. Water engineers, cyber specialists, operators, and independent reviewers should agree on the test boundary, manual fallback, abort conditions, and recovery evidence first.
  • Treat a field pilot as a separate decision. It would require resolved authority, engineering evidence, operator approval, funding, monitoring, and a tested rollback. If any of those conditions cannot be met, stop or choose another option.
05

Public responsibility

My position is that government should fund and set the public-safety rules for any future coordination that could affect water use. The water utility and other asset owners must retain authority over their own operations. Governments should bring the right operators and specialists together, define the legal and safety boundaries, and make sure no feature can override local protection or emergency responsibility.

That work should include Water Corporation and relevant councils and emergency services, alongside state and Australian Government agencies, water engineers, cyber and safety reviewers, and the organisations that supply connected equipment. Their roles are not interchangeable. A council may need to plan for consequences without owning or controlling the utility equipment. A vendor may operate a platform without being accountable for public water policy.

There is no confirmed sponsor, partner, or commitment behind this proposal. The site and software are a way to explain the idea and invite scrutiny. They do not grant authority, satisfy an operator’s obligations, or turn a concept into a public program.

06

Where the public fits

I am using the Resilience Mesh site to help carry a focused request to Water Corporation, local councils, and the state and federal bodies responsible for water, infrastructure, and emergency planning: fund an independent feasibility stage before deciding whether to build anything.

If you work in water operations, local government, emergency management, irrigation, water engineering, operational technology, cyber security, or public-sector governance, I would value a correction, a critical review, or help identifying the right office to approach. I am not asking residents to connect equipment or to take control of household devices. Public involvement should help put the question in front of accountable decision-makers.

The most useful next step may turn out to be a different plan entirely. I would rather have that answer before an emergency than ask people to trust a system whose authority, limits, and recovery have not been established.